Enable Chart Status

Updated by Travis Bates

To enable chart status you must first add a target range. How to CREATE A TARGET RANGE


Enable Chart Status

  • Click the vertical ellipsis icon (three dots).
  • Select Target Ranges.
  • Toggle Report Status on.
  • Toggle Individual Traces on
  • Click Accept.


The chart will display a green checkmark when the value(s) are inside the target range. The report status will have a green OK when all charts inside the report section have green checkmarks.


The chart will display a Red exclamation mark ! when one or more sensor traces are outside the target range.

The report status will turn Orange and have a value inside that represents the number of charts in the report that have values outside the target range.


With the sections collapsed you can view the status of multiple reports at a glance.

NOTE: The ZL6 data logger by default uploads data once an hour to the cloud. Each upload contains a series of data points. The notification is based on the last data point received in the upload.


How did we do?